Interfaith Works of CNY, Save the Rain Green Improvement Project, Parking Lot Rehabilitation
The project consists of conditioning/resurfacing the existing driveway access (3,700 sq ft) and reconstructing the existing parking lot (9,300 sq ft) with porous pavement and 21,700 conventional asphalt pavement. In addition, installing 400lf of storm sewers, two bio-retention basins, landscaping, associated signage and pavement markings.
Addendum 01
(click to expand/collapse)

Name | Size | ||
Addendum No 1_5-5-2023_Stamped | 9.7 MB |