Town of Farmington - NYS Route 332 Watermain Replacement
Project involves the installation of approximately 700 LF of new 8" watermain in two locations: crossing under NYS Route 332 by directional drill and along Hathaway Drive from CR-41 to Lake Run. Work also includes abandoning the existing watermain along NYS RT332 including hydrant and valve box removal
Status
Accepting Bids
Prebid Date | 6/12/25 2:00pm |
Bid Date | 6/24/25 2:00pm |
Location
NYS Route 332, and Hathaway Drive near CR-41
This project requires a non-refundable fee of $100 made payable to Avalon.
Electronic download option available for a non-refundable fee of $49 made payable to Avalon.