Town of Farmington - NYS Route 332 Watermain Replacement

Project involves the installation of approximately 700 LF of new 8" watermain in two locations: crossing under NYS Route 332 by directional drill and along Hathaway Drive from CR-41 to Lake Run. Work also includes abandoning the existing watermain along NYS RT332 including hydrant and valve box removal
00 Full Set of Specs (click to expand/collapse)