Town of Farmington - NYS Route 332 Watermain Replacement

Project involves the installation of approximately 700 LF of new 8" watermain in two locations: crossing under NYS Route 332 by directional drill and along Hathaway Drive from CR-41 to Lake Run. Work also includes abandoning the existing watermain along NYS RT332 including hydrant and valve box removal

Status

Accepting Bids

Prebid Date 6/12/25 2:00pm
Bid Date 6/24/25 2:00pm

Company & Contacts

MRB Group
David Herman  
(585)-381-9250

Location

NYS Route 332, and Hathaway Drive near CR-41

This project requires a non-refundable fee of $100 made payable to Avalon.

Electronic download option available for a non-refundable fee of $49 made payable to Avalon.